North Switch Tie Colouring

Before getting on to colouring ties, I had to correct the throw rod hole. Unfortunately, when Andrew was here on Wednesday, we aligned the hole for the throw rod with the original centreline. Now that the centreline has moved, I needed to move the hole over as well. This was a simple matter of whittling […]

Read More North Switch Tie Colouring

Ties for the North Switch

After scratching my head for a while over the misalignment here at the north switch of the siding, I decided to pull a few more ties off and smooth it all out. With the aid of a wooden spline and my darling wife, who braved basement and sore back, we got a new centreline marked […]

Read More Ties for the North Switch

One More Turnout to go

Andrew came over last night, with the intention of starting to test the parts that we’ve already done. However, I got to thinking that the only thing stopping us from connecting the two sections was the corner desk top, and I can as easily slide that in the side as drop it in the top. […]

Read More One More Turnout to go

Researching the turntable

In 1905, Pembroke had a 50’3″ turntable. Sadly it was removed in the 30’s when the passenger trains were run by a gas-electric, which was too long to fit on the turntable. So, we have no pictures of it, much less plans. From the 1908 GTR bridges and building book, we know it was almost […]

Read More Researching the turntable

Installation Day!

This afternoon, I invited a bunch of good friends, Andrew, Scott, Ken, Julian as well as Margot and Patty over to help install the layout in the basement. I wasn’t quite as ready as I’d hoped to be, but with so many helpers, we managed to get it installed all the same. When we finished, […]

Read More Installation Day!

Clouds

Most of my railroad time this week was spent on painting the clouds. Like everything else, I got better at this as I went along, and so, I kind of did it about one and a half times. I roughed the clouds in on Sunday with some plain white paint, and they looked pretty flat […]

Read More Clouds

Constable it Ain’t

Tonight I painted a base layer for the clouds. They’re definitely going to take a second layer before the white covers over that hideous not-quite-gradient of blue that I put up there. As this is only the base layer, I didn’t bother with any shadows, and so, the clouds have no form yet. So, it […]

Read More Constable it Ain’t

Base Cabinets Stained

This week, I made the face frames for the base cabinets, and I just finished staining them. I must say, despite Andrew’s warnings that it would not go well, I am impressed with the results. Here they are drying, or setting or whatever stain does: The stain is Old Masters Red Mahogany gel stain. I […]

Read More Base Cabinets Stained

More Switch Stand Refinements

Andrew and I got together the other day and finished up the switch stands for the north section. This resulted in yet more refinements to the design, as well as some creative problem-solving. The first refinement was Andrew’s suggestion to not tap the hole in the throw rod extension, but rather to use two nuts, […]

Read More More Switch Stand Refinements