1120 Done for Now

After more months than I’d planned, 1120 has left the workbench and returned to Golden Lake to resume service to Pembroke. I decided to experiment with a dot filter on the boiler and tender, and it came out a little heavier than I would have liked. However, considering it is not on home rails, perhaps […]

Read More 1120 Done for Now

Coal loads for 1120 and 622

I had already started to put 1120 together again when I realized the coal bunker was still just sheets of lead. I’ve made this mistake before, and narrowly averted disaster when I discovered that #10’s tender was not water-tight and consequently wound up dribbling glue all over the electronics inside. So, this time I did […]

Read More Coal loads for 1120 and 622