After a decade, I feel I finally understand some of the ongoing problems with the turnouts on Pembroke. One part that seems to fail often is the gauge through the points. In order to make the points sit properly against the stock rails, the foot of one side of the stock rail was filed away in a most unprototypical manner. This made the Code 55 rail very weak, and any change in temperature sends the stock rails for a wobble that attracts my track gauge and my ire.
I’ve been using CA to fix these issues when they appear. The trouble with that choice is that CA is strong in tension but week in sheer, and that is exactly the force it is encountering when trains bump over it and the sun beats down. It would be better if I could use epoxy, but how to hold the track in gauge while the epoxy sets?
Enter the long gauge. This H-shaped assembly is exactly 16.5mm wide, and 17.5 scale feet long. All my switches are 16.5 footers, and like prototype switches of the era, both directions are straight. The six scale inches at each end mean I’m gauging off the stock rail and the tip of the closure rail, rather than the point, which is also flexible. The long gauge can just sit in the point all night long while the epoxy sets, and I know in the morning, the track will be at least wide enough.
I have high hopes that the long gauge is going to be the ticket to robust stock rails going forward.
